Available City Building Services During COVID-19 Phase 2

Pod

 

At this time, all office visits will be by appointment only.

To schedule an appointment with the Permit Center, Planner of the Day, Engineering, or Building Inspectors, either email us at building@rocklin.ca.us or call our main line at (916) 625-5120.

Note:  Checks and Credit Cards are preferred over cash.

 

Self-Certification

A self-certification process has been implemented for builders and contractors allowing construction to continue. The process allows for licensed contractors, engineers of record and architects to conduct their own inspections and provide verification letters and other documentation to the City as they progress with construction. For more information contact building@rocklin.ca.us.

The City’s self-certification policy has changed.  Now allowed through the self-certification policy are:

  • HVAC Change outs
  • Re-Pipes
  • Window Replacements (like for like)
  • Hot water replacements
  • Whole house fans
  • Small alterations, which include no structural changes or fire sprinkler adjustments may utilize the self-certification policy with City approval.

Self-Certification Forms:

Self Certification - Residential Additions & Remodels ( By City Approval Only)

Self Certification - Inspection Check List

Self-Certification - Residential Water Heater, Re-roofs, Plumbing Re-Pipe and HVAC/Furnace Replacement